Regular agenda
Nine items heard in public, in order. Public comment is taken on each.
Not scored. This is a presentation; nothing is being approved, so there is nothing to verify.
ClockNo decision
- Oct. 6, 2026Presented at the meeting
Presentation only. Nothing is decided and no follow-up date is set.
Money None
WhoWounded Warrior Project (presenter Bill Hayes); no County department is named as sponsor.
WhatA presentation asking for an ongoing seat for adaptive-cycling input in County trail design. No motion, no agreement.
WhereCounty trail network generally; the Matanzas to St. Augustine–Palatka trail connector is mentioned.
WhenSubmitted July 16; heard today. No follow-up date.
Why"Small design considerations made before construction can significantly improve accessibility."
Record checkOne-page cover sheet only. No MOU, no deliverable, no district. The contact number listed is a County exchange.
Look intoWhich trail project this attaches to and whether a written design-review role will follow.
Conflict check Wounded Warrior Project. No relationship found
DocumentsPrimary records
Retrieved October 3, 2026, about 5 PM ET. REG01: SHA-256 1777d42def7f8170…, Clerk file modified Wed, 30 Sep 2026 20:02:15 GMT
98 of 100 · Verifiable. You can check what the Board is approving using only what the County posted. What cost points: Facility type marked "New" (p. 6) but scored as speculative space (p. 3) (-2). How to read the score
Corrected Oct. 3, 2026 The first edition said the application's job and wage fields were blank and the signature page unsigned. Both are filled in and e-signed (PDF pp. 6, 8). The answers are stored as form fields, which our first text pass did not read.
Corrected Oct. 3, 2026 The first edition said the return-on-investment assumptions were not shown and that the packet gave no address. The calculation is on p. 4 and the application gives the road (Agricultural Center Dr., p. 7).
Clock
- Oct. 6, 2026Board directs drafting
- Mar. 3, 2027Impact-fee rate rises; reimbursement grows if permits pull after
The agreement itself returns on a later agenda, date not set.
Money $969,205.66 over four years, starting FY29
Reconciliation| Figure | Source | Includes | Excludes | Ties? |
|---|
| $969,205.66 | REG02 pp. 3-4 | Impact fees $313,029.60 + connection fees $188,186.46 + 4 yrs tax $467,989.60 | Rate increase after March 3, 2027 | Yes |
WhoPlatform Real Estate Group, LLC; application e-signed by its vice president (p. 8). Economic Development, Christine Valliere.
WhatDirect the County Attorney to draft an incentive agreement: 100% of impact fees ($313,030) and water/sewer connection fees ($188,186) plus four years of general-county property tax ($467,990) for a 246,480 sq ft speculative warehouse, $26M capital investment.
WhereParcel 0875500080 on Agricultural Center Dr., with I-95 visibility (application, p. 7); zoned Industrial Warehouse.
WhenCompletion expected Q1 2028; first payment FY29. Impact-fee rate rises March 3, 2027, which would raise the reimbursement.
WhyStaff: project scored 6 points under Ordinance 2014-30's speculative-space category and shows a "193% return on investment" over 20 years.
HistoryOrdinance 2014-30 (June 2014) created the Business Incentive Program: point-based rebates of impact fees, connection fees and county property tax, each approved by the Board. Recent awards were AdventHealth (April 2025, $222,374 cap, 56 jobs) and Vermeer Southeast (July 2025, $166,645, 18 jobs); 2024 saw a $107,224 warehouse grant and the $2.96M "Project Boilermaker." At $969,206 with no job commitment this would be among the program's largest. State corporate records show Platform Real Estate Group, LLC as a Delaware company based in Louisville, Kentucky (manager Thomas J. Floyd), registered to do business in Florida on Sept. 18, 2026, a month after the County memo recommending it. The packet gives no street address for parcel 0875500080.
Record checkThe application is filled in and e-signed by a company vice president on July 10 (pp. 5-8). It estimates about 70 new jobs (nine suites of 4 to 20 employees each), answers "Unsure" on retained jobs, and gives Jacksonville-area wage ranges of $39,700 to $102,400 from JobsEQ data, noting they depend on future tenants. The application marks facility type "New," not "Speculative" (p. 6); staff scored it under the speculative-space category (p. 3). The 193% figure is calculated on p. 4: $2,841,164 in general-county taxes and fees over 20 years, minus the $969,206 incentive, divided by the incentive. It holds the $26 million value flat for 20 years. The applicant asked for confidentiality (p. 8); the application is in the public packet. Florida records show the company, a Delaware LLC based in Louisville, registered to do business in Florida on Sept. 18, 2026; the staff memo is dated Aug. 18.
Look intoWhether the future agreement will tie payments to jobs or wages; why a project marked "New" was scored as speculative space; what happens to the 20-year figure if the building is not fully leased.
Conflict check Platform Real Estate Group, LLC. No relationship found
Score worksheet: 25 + 23 + 25 + 25 = 98
| Rule | Part | Points | Evidence in the packet |
|---|
| K3 | Consistency | -2 | Facility type marked "New" (p. 6) but scored as speculative space (p. 3) |
DocumentsPrimary records
Official web pages and portals
Press
Retrieved October 3, 2026, about 5 PM ET. REG02: SHA-256 de63463893512c6c…, Clerk file modified Tue, 29 Sep 2026 19:18:18 GMT
86 of 100 · Mostly verifiable. You can check most of it; one or two pieces are missing, unclear or don't match. What cost points: Vegetation described as non-protected pines (p. 9) and preserved wetlands (p. 11) (-2); Two parcel IDs appear (072451-0001 and 072450-0000) (-2); Status of code case PRIDE 2602879 not shown (-5); Water-management permits for added wetland impacts not shown (-5). How to read the score
Clock
- Oct. 6, 2026Decision (ordinance)
Money $208 after-the-fact clearing fee; double fees at permit
WhoIGP Commerce Center LLC; agent Matthew Lahti, Gulfstream Design Group. Planner Evan Walsnovich.
WhatRemove 0.26 acres to a companion rezoning, add an 18th lot (2.44 ac, RV/boat storage) with about 1.9 acres of wetland impact, and allow a second monument sign. Wetland impacts rise from 3.33 to 5.53 acres.
WhereInternational Golf Parkway about 0.2 mile west of US-1, Thomas Industry Way. Two different parcel IDs appear in the packet (072451-0001 and 072450-0000).
WhenPZA recommended approval 4-2 on Aug. 20. Original PUD Ordinance 2019-69.
WhyStaff presents both approval and denial findings; SJRWMD's newer delineation increased the wetland acreage.
HistoryAbout 59 acres at the southwest quadrant of International Golf Parkway and US 1. Before 2019 it was vacant timberland zoned Open Rural and Industrial with a 2014 special-use permit for a recycling center (owner Smart Recycling of North Florida). On Nov. 5, 2019 the Board enacted Ordinance 2019-69 (PUD 2018-03; PZA 6-0, BCC 5-0) for up to 290,000 sq ft of industrial, warehousing and recycling uses on about 29 developable acres with 30.38 acres of wetland preserved; the 17-lot master plan was recorded in 2022. Per the staff report about 111,186 sq ft is built, 16 of 17 lots have construction-plan approval, and Lot 12 is a 49-space RV and boat storage yard. This is the first modification. The companion rezoning for the 0.26 acres (REZ 2025-17, St. Marks Parcel 2, 68.5 acres to IW) is still under review after a second resubmittal on Sept. 30.
Record checkUnpermitted clearing occurred on the footprint of the new Lot 18 (code case PRIDE 2602879). The staff report describes the cleared vegetation two ways: non-protected slash pines (p. 9) and preserved wetland areas (p. 11). The packet does not say whether the code case is closed or whether water-management permits cover the added wetland impacts. At PZA the applicant "could not provide a straight answer" on when the wetlands were impacted (p. 14).
Errors in the County's packet- Cleared vegetation described as non-protected slash pines (p. 9) and as preserved wetlands (p. 11)
Look intoStatus of the code case; whether approving Lot 18 ratifies the clearing for $208; why the companion rezoning is not heard concurrently.
DisclosureMatthew Lahti of Gulfstream Design Group, the applicant's agent on this item, has worked with The Outpost @ Old Moultrie Rd, which sponsors the Coalition. The Coalition has no interest in this application.
Conflict check IGP Commerce Center LLC; agent Matthew H. Lahti, Gulfstream Design Group. Related: see disclosure
Score worksheet: 25 + 21 + 15 + 25 = 86
| Rule | Part | Points | Evidence in the packet |
|---|
| K3 | Consistency | -2 | Vegetation described as non-protected pines (p. 9) and preserved wetlands (p. 11) |
| K3 | Consistency | -2 | Two parcel IDs appear (072451-0001 and 072450-0000) |
| T6 | Transparency | -5 | Status of code case PRIDE 2602879 not shown |
| T6 | Transparency | -5 | Water-management permits for added wetland impacts not shown |
DocumentsPrimary records
Official web pages and portals
Retrieved October 3, 2026, about 5 PM ET. REG03: SHA-256 8093d9059fd8d3d4…, Clerk file modified Tue, 29 Sep 2026 19:18:19 GMT
90 of 100 · Verifiable. You can check what the Board is approving using only what the County posted. What cost points: Impact-fee credits: $19,505,738.80 in the agreement (p. 15) vs. $19,396,839 by staff (p. 7) (-10). How to read the score
Corrected Oct. 3, 2026 The first edition said the packet does not reconcile the two proportionate-share figures. Staff attributes the gap to the applicant's reading of the statute, and both calculations are in the packet (pp. 41, 45).
Clock
- Oct. 6, 2026First hearing
- Oct. 20, 2026Second hearing and decision
Money $20,000,000 mitigation; $19.4–19.5M in impact-fee credits
Reconciliation| Figure | Source | Includes | Excludes | Ties? |
|---|
| $20,000,000 | REG04 pp. 4, 13 | Mitigation for 512 units, paid in two installments | $5,040,000 already paid for 442 platted lots | Yes: $13.8M + $6.2M |
| $19,505,738.80 | REG04 p. 15 | Road impact-fee credits granted to the applicant | Staff's lower figure of $19,396,839 (p. 7) | No: agreement and staff report differ by $108,900 |
WhoPulte Home Company, LLC; owners Homestead Investments, Day Late Enterprises, Toll Southeast. Attorney Zach Miller. Transportation planner Lauren Dwyer.
WhatAnnounce the second hearing (Oct. 20). The agreement would have Pulte pay $20M in two phases ($13.8M within 90 days, $6.2M within a year) for the remaining 512 units and receive road impact-fee credits of $19.4M (staff) to $19.5M (applicant).
WhereSouth side of SR 16 between International Golf Parkway and I-95; about 524 acres. Prior developer was declared in default in 2023.
WhenNotice published Sept. 15; second hearing Oct. 20 with companion MAJMOD 2026-01, which cuts the PUD from 999 to 954 units.
WhyStaff identifies ten adversely affected road links on SR 16, IGP and CR 2209; proportionate share under staff's method is $12,850,449.
HistoryGrand Oaks is about 524 acres owned in 2017–18 by Day Late Enterprises. On July 17, 2018 the Board adopted the land-use change and the PUD (Ordinances 2018-39 and 2018-40), each 3-2, for 999 homes, 100,000 sq ft of commercial, a school site and 89 acres of wetland preservation, and approved on consent a concurrency agreement with Southeast Development Partners: $7,500 per lot for the first 212 and $15,000 for lots 213–580 inside a $15 million package, plus a commitment to four-lane about three miles of SR 16 before the 581st lot. Southeast escrowed $5,040,000 for 442 platted lots. On Feb. 21, 2023 the Board denied its request to rework the deal and declared it in default, both 5-0, sending the escrow to FDOT for SR 16 design. Southeast sued in March 2023 and lost in federal court on Sept. 13, 2024; the County said the SR 16 cost had grown from about $15M to more than $60M. An Eleventh Circuit appeal was argued in September 2025 with no decision found. The owner removed Southeast as development manager on Sept. 20, 2024. Pulte, which has built Summer Bay, Spring Park and The Trails at Grand Oaks (about 437 homes), now proposes $20M for the remaining 512 units.
Record checkThe proportionate-share figures differ: staff $12,850,449 (p. 4), the agreement $2,471,306.04 (p. 13). Staff attributes the gap to "the applicant's interpretation" of the statute (p. 4). Both tables are in the packet: the applicant's Table 7 counts only the two SR 16 links that fail concurrency (p. 41); staff's spreads cost across the affected links (p. 45). Credits differ too: $19,505,738.80 in the agreement (p. 15) against staff's $19,396,839 (p. 7). Unit math checks (144+145+68+136+19 = 512). The agreement as read does not name the road projects the payment funds.
Look intoWhat road impact fees the 512 units would owe without the agreement; which SR 16 or CR 2209 projects the money funds and when; which proportionate-share and credit figures the Oct. 20 version adopts.
Conflict check Pulte Home Company, LLC; attorney Zachary Miller. No relationship found
Score worksheet: 25 + 15 + 25 + 25 = 90
| Rule | Part | Points | Evidence in the packet |
|---|
| K1 | Consistency | -10 | Impact-fee credits: $19,505,738.80 in the agreement (p. 15) vs. $19,396,839 by staff (p. 7) |
DocumentsPrimary records
- PacketAgenda packet REG04 (77 pp., 6.2 MB)
- OrdinanceOrdinance 2018-40, original PUD (scan)
- PacketBCC July 17, 2018 PUD packet (999 units)
- Packet2018 concurrency and impact-fee credit agreement ($15M package)
- MinutesBCC July 17, 2018 minutes (both 3-2)
- PacketBCC Feb. 21, 2023 packet: amendment request, staff recommended denial
- MinutesBCC Feb. 21, 2023 minutes: denial and default, 5-0; $5.04M escrow to FDOT
- PacketPZA Sept. 17, 2026 agenda and staff packets
- StatuteF.S. 163.3180(5)(h): impact-fee credits, 20% reduction
- StatuteF.S. 163.3220, Development Agreement Act
Official web pages and portals
Press
Retrieved October 3, 2026, about 5 PM ET. REG04: SHA-256 fbcf7dc5c240f4a1…, Clerk file modified Tue, 29 Sep 2026 19:18:19 GMT
5
MAJMOD 2026-09, Durbin Park PUD (East Parcel)
Public hearing, ordinance · District 5 (agenda) · Packet
Presenter: Ellen Avery-Smith, Esq., Rogers Towers, P.A. · Staff contact: Abrielle Genest, Senior Planner
100Verifiable25252525
100 of 100 · Verifiable. You can check what the Board is approving using only what the County posted. Nothing cost points. How to read the score
Corrected Oct. 3, 2026 The first edition said the opposition letter could not be read. It is readable (p. 157).
Clock
- Oct. 6, 2026Decision (ordinance)
Money No County funds
WhoDurbin Creek National, LLC; agent Ellen Avery-Smith, Rogers Towers. Senior planner Abrielle Genest.
WhatMultifamily 2,265 to 1,520 (−745); single-family 0 to 330; retail 2,397,130 to 1,697,130 sq ft (−700,000). Seven new waivers: 5-ft front setbacks, 3,200 sq ft minimum lots, no sidewalks in cul-de-sacs, trees in common areas instead of lots, signs up to 60 sq ft per face.
WhereSouth of Race Track Road, east of I-95, about 295 acres of the 1,281-acre PUD. Parcel 023480-0000.
WhenPZA recommended approval 5-1 on Sept. 17. Companion items 6 and 7 are decided today too.
WhyStaff: density falls from 2.9 to 2.37 units/acre and external trip generation does not increase. Staff notes concern about the "cumulative effect of reduced setbacks, narrower lots, and smaller lot areas" but recommends all seven waivers.
HistoryDurbin Park is roughly 1,624 acres of former timberland south of Race Track Road on both sides of I-95, owned by Durbin Creek National, LLC, an affiliate of Gate Petroleum. The County designated it Intensive Commercial in 2000. In February 2015 the Board approved the framework still in force: an urban service area (Ord. 2015-4), a 30-year tax-increment trust fund pledging 95% of new county property-tax revenue to road reimbursement (Ord. 2015-5), and developer-paid road capacity charges (Ord. 2015-6). The project was pitched then as 2.4M sq ft of retail, 2.8M sq ft of office, 350 hotel rooms, 999 apartments and a Bass Pro Shops, with the County projecting $449.6M in taxes over 20 years against $9,144 a year as timberland. Walmart opened the Pavilion in 2018. The 2020 PUD reset Phase 2 at 2,265 apartments and a hospital; East Peyton Parkway opened six-lane in 2024, the $285M UF Health hospital is due this fall, and a Whole Foods-anchored center is planned. Bass Pro opened at World Commerce Center instead. Today's package converts 745 of the apartments into up to 330 houses and cuts 700,000 sq ft of retail.
Record checkOne resident letter is in the packet (Attachment 3, p. 157); it asks the County to evaluate a large oak near the property line and the residential buffer before clearing. Staff reports school concurrency review is required only above a threshold (p. 36). The agenda records the PZA dissent but not its reason. The packet does not discuss the effect of single-family homes on the tax-increment district that repays the roads, or re-run the 2015 revenue projection for the new mix.
Look intoThe opposition letter and the drainage concern raised at PZA; whether 5-ft setbacks match other recent County TND approvals; what the shift does to TIF revenue.
Conflict check Durbin Creek National, LLC; Rogers Towers, P.A. No relationship found
Score worksheet: 25 + 25 + 25 + 25 = 100
| Rule | Part | Points | Evidence in the packet |
|---|
| No deductions: every part starts at 25. |
DocumentsPrimary records
Press
Retrieved October 3, 2026, about 5 PM ET. REG05: SHA-256 3fa6b459186312a8…, Clerk file modified Tue, 29 Sep 2026 19:18:21 GMT
6
DEVAGRMOD 2026-01, Durbin Creek National development agreement, third amendment (second hearing)
Public hearing, decision · District 5 (agenda) · Packet
Presenter: Ellen Avery-Smith, Esq., Rogers Towers, P.A. · Staff contact: Jan Trantham, Senior Transportation Planner
93Verifiable23252025
93 of 100 · Verifiable. You can check what the Board is approving using only what the County posted. What cost points: Exhibits 1-3, the operative dollar tables, are scans (pp. 15-17) (-2); Reimbursement paid to date and balance not stated (-5). How to read the score
Corrected Oct. 3, 2026 The first edition said Exhibits 1-3 could not be read. They are scanned pages 15-17.
Clock
- Oct. 6, 2026Second hearing and decision
Money Phases 1–3 roadway costs finalized at $56,103,162
Reconciliation| Figure | Source | Includes | Excludes | Ties? |
|---|
| $56,103,162 | REG06 p. 9 | Developer-built road costs, Phases 1-3 | Phase 4 (moved to FDOT); reimbursements paid to date | Yes: $19,712,274 + $36,390,888 |
WhoDurbin Creek National, LLC; Ellen Avery-Smith. Senior transportation planner Jan Trantham.
WhatApprove the third amendment converting 745 apartments to 330 single-family in Phase 2B and fixing the developer-built road costs at $56.1M (Phase 1 $19.7M; Phases 2A/2B/3 $36.4M). Phase 4, I-95 widening, moves to FDOT.
WhereThe Durbin Creek National urban service area, 1,624 acres both sides of I-95 south of Race Track Road.
WhenFirst hearing Sept. 15 with no testimony; decision today, concurrent with item 5.
WhyStaff "does not object"; trip generation does not increase and required roads are built or funded.
Record checkExhibits 1-3 (road-capacity-charge schedule, buildout projection, land-use conversion) are in the packet as scanned pages 15-17. Phase costs add: $19,712,274 (Phase 1) + $36,390,888 (Phases 2A, 2B, 3) = $56,103,162 (p. 9). The packet does not state how much the developer has been reimbursed to date or the balance outstanding.
Look intoThe actual exhibit tables; cumulative road-capacity-charge and TIF reimbursements paid since 2015; the remaining balance.
Conflict check Durbin Creek National, LLC; Rogers Towers, P.A. No relationship found
Score worksheet: 23 + 25 + 20 + 25 = 93
| Rule | Part | Points | Evidence in the packet |
|---|
| C4 | Completeness | -2 | Exhibits 1-3, the operative dollar tables, are scans (pp. 15-17) |
| T6 | Transparency | -5 | Reimbursement paid to date and balance not stated |
DocumentsPrimary records
Press
Retrieved October 3, 2026, about 5 PM ET. REG06: SHA-256 4dec99a3baab607a…, Clerk file modified Tue, 29 Sep 2026 20:09:49 GMT
84 of 100 · Mostly verifiable. You can check most of it; one or two pieces are missing, unclear or don't match. What cost points: Ordinance body and fee schedule are scans (pp. 2-5) (-2); Schedule counts 2,397,130 sq ft of shopping; item 5 caps commercial at 1,697,130 (-10); Single-family rate: 2.26 x $1,567 = $3,541, listed $3,538 (-2); 330 x $3,538 = $1,167,540, listed $1,167,415 (-2). How to read the score
Corrected Oct. 3, 2026 The first edition said the ordinance body and fee schedule were not in the posted packet. They are scanned pages 2-5. (The Clerk's file was last modified Oct. 1.)
Clock
- Oct. 6, 2026Decision (ordinance)
Money Road-capacity charges totaling $12,862,873 (schedule, p. 4)
Reconciliation| Figure | Source | Includes | Excludes | Ties? |
|---|
| $12,862,873 | REG07 p. 4 | Projected road-capacity charges at buildout | Charges already collected | Arithmetic yes; retail quantity differs from item 5 |
WhoDurbin Creek National, LLC; Jan Trantham.
WhatAdd single-family to the road-capacity-charge schedule, reduce multifamily to 1,520, allow up to 330 single-family in Parcel E.
WhereDurbin Creek National area; single-family allowed only in the East Parcel (east of I-95).
WhenPublished Sept. 15; enactment today.
Why"There is no change to the total anticipated revenue of $12,862,873." (agenda)
Record checkThe ordinance body and amended fee schedule are scanned pages 2-5. The schedule totals $12,862,873: apartments 1,520 at $1,567; single-family 330 at $3,538; office, shopping, hotel and hospital unchanged. It defines the single-family charge as the apartment charge times 2.26 ($3,541), but lists $3,538; and 330 x $3,538 is $1,167,540, not the $1,167,415 shown. The schedule still counts 2,397,130 sq ft of shopping, while item 5 caps commercial at 1,697,130 sq ft (REG05 p. 35).
Errors in the County's packet- Single-family rate stated as $1,567 x 2.26 ($3,541) but listed as $3,538
- 330 x $3,538 = $1,167,540, listed as $1,167,415
Look intoWhich retail figure the revenue projection should use; whether the $3,538 rate or the 2.26 multiplier governs; charges collected to date.
Conflict check Durbin Creek National, LLC. No relationship found
Score worksheet: 23 + 11 + 25 + 25 = 84
| Rule | Part | Points | Evidence in the packet |
|---|
| C4 | Completeness | -2 | Ordinance body and fee schedule are scans (pp. 2-5) |
| K1 | Consistency | -10 | Schedule counts 2,397,130 sq ft of shopping; item 5 caps commercial at 1,697,130 |
| K3 | Consistency | -2 | Single-family rate: 2.26 x $1,567 = $3,541, listed $3,538 |
| K3 | Consistency | -2 | 330 x $3,538 = $1,167,540, listed $1,167,415 |
DocumentsPrimary records
Retrieved October 3, 2026, about 5 PM ET. REG07: SHA-256 9d7a84dc43666399…, Clerk file modified Thu, 01 Oct 2026 18:11:19 GMT
95 of 100 · Verifiable. You can check what the Board is approving using only what the County posted. What cost points: "Influx" of variance requests asserted without a count (p. 3) (-5). How to read the score
Money None
WhoCounty-initiated at the request of the Ponte Vedra Zoning and Adjustment Board. Planning manager Jacob Smith.
WhatRaise maximum lot coverage from 40% to 44% on lots of 8,000 sq ft or less in R-1-C and R-1-D, with the extra 4 points usable only for swimming-pool water surface. About 177 lots qualify.
WherePonte Vedra Zoning District.
WhenPVZAB approved 6-0 on Aug. 3; first reading Sept. 15; adoption today.
Why"An influx of variance requests" for lot coverage on small lots; staff says drainage impact would be minimal.
HistoryThe Ponte Vedra Zoning District Regulations are a stand-alone code adopted in 2003 and recodified in 2011 and 2020, capping single-family lot coverage at 40%. Staff told the Ponte Vedra Zoning and Adjustment Board in April 2026 that about seven pool-related coverage variances had been sought in roughly 20 years. The board asked for research in October 2025, voted 6-0 in April to draft an amendment for lots of 7,200 sq ft or less, tabled it in June to widen the threshold to 8,000, and recommended approval 6-0 on Aug. 3. About 177 parcels qualify.
Record checkThe packet cites an "influx" of variance requests (p. 3) but gives no count; PVZAB's April 2026 minutes record staff estimating about seven pool-related variances in roughly 20 years. No drainage analysis is attached. Residents wrote in opposition citing flooding; the packet has no staff response. The ordinance text is on pp. 7-9.
Look intoHow many pool variances PVZAB has handled since 2020; whether any runoff analysis exists for the 177 lots.
Conflict check County-initiated (PVZAB). No relationship found
Score worksheet: 25 + 25 + 20 + 25 = 95
| Rule | Part | Points | Evidence in the packet |
|---|
| T6 | Transparency | -5 | "Influx" of variance requests asserted without a count (p. 3) |
DocumentsPrimary records
Official web pages and portals
Retrieved October 3, 2026, about 5 PM ET. REG08: SHA-256 0019e97e4c5ed7f6…, Clerk file modified Tue, 29 Sep 2026 19:18:23 GMT
100 of 100 · Verifiable. You can check what the Board is approving using only what the County posted. Nothing cost points. How to read the score
Corrected Oct. 3, 2026 The first edition said no data center had been proposed in the county. We had not checked the County's application portal; the statement is withdrawn.
Clock
- Oct. 6, 2026First presentation
- Oct. 20, 2026Public hearing, enactment
- Nov. 1, 2026Takes effect; sufficiency cutoff
- Oct. 31, 2027Expires unless repealed sooner
Money None
WhoOffice of the County Attorney (Kealey West), on Board direction from Sept. 1.
WhatA countywide pause through Oct. 31, 2027 on accepting or processing land-use and building applications for medium-scale (2,000–5,000 servers, 5–49 MW) and large-scale data centers, effective Nov. 1, 2026. Applications "determined sufficient" before Nov. 1 are exempt.
WhenHearing Oct. 20; effective Nov. 1; expires Oct. 31, 2027 or on adoption of permanent rules. The state OPPAGA study is due July 1, 2027.
WhyThe Comprehensive Plan and LDC have no data-center policies on siting, water, cooling, generators, fuel storage, noise or decommissioning; SB 484 (2026) flagged the issue.
HistoryIn May 2026 Commissioner Taylor moved to bar data centers from incentives and restrict siting; it failed 2-3, with the majority asking for a staff briefing. After Nassau County adopted a 12-month moratorium on June 9 and Clay County followed on June 24, the Board agreed unanimously on June 16 to take one up, and on Sept. 1 directed the County Attorney to draft it. SB 484 (Ch. 2026-65, effective July 1) affirms local planning authority over large-load customers, limits water permits for 50 MW+ facilities and orders a state study due July 1, 2027.
Record checkNo staff report or PZA review is attached. Who makes the "sufficiency" call in the window between enactment and effect is not specified. Facilities under 2,000 servers are not addressed. The packet identifies no pending application; we have not checked the County's application portal. No vested-rights or hardship procedure.
Look intoWhether any data-center application is in review now; whether PZA review is required for a moratorium; the gap between the County's definitions and the statute's.
Conflict check County-initiated. No relationship found
Score worksheet: 25 + 25 + 25 + 25 = 100
| Rule | Part | Points | Evidence in the packet |
|---|
| No deductions: every part starts at 25. |
DocumentsPrimary records
Press
Retrieved October 3, 2026, about 5 PM ET. REG09: SHA-256 d4d207dbb956eb2b…, Clerk file modified Tue, 29 Sep 2026 19:18:21 GMT
Consent agenda
Twenty-four items approved in one vote with no discussion unless a commissioner pulls one. This is where most of the money is.
90 of 100 · Verifiable. You can check what the Board is approving using only what the County posted. What cost points: Registers list payee, date and amount; no project or fund for any payment (-10). How to read the score
ClockHistorical
- Sep. 8, 2026Last payment date covered
Payments already made Aug. 25 to Sept. 8; the vote ratifies the record.
Money $16,651,997.63 across five registers
Reconciliation| Figure | Source | Includes | Excludes | Ties? |
|---|
| $16,651,997.63 | CON01 pp. 2, 6, 7, 11, 12 | Five check registers, Aug. 25 to Sept. 10 | Project or fund for each payment | Yes, as our sum; the packet states no grand total |
WhoBCC Accounting (Clerk's office), Donna Echegoyen.
WhatApprove payments already verified: Aug. 28 register $8.64M; Sept. 4 register $7.97M; three small registers.
WhenPayment dates Aug. 25 to Sept. 8.
WhyFlorida Statute 136.06 requires board-issued checks or warrants.
Record checkRegister totals: Aug. 25 $12,070.29 (p. 2); Aug. 28 $8,644,687.62 (p. 6); Sept. 1 $17,588.43 (p. 7); Sept. 4 $7,969,218.52 (p. 11); Sept. 10 $8,432.77 (p. 12). The packet states no grand total; our sum is $16,651,997.63. Largest payees: Wharton-Smith ($4.25M across two registers), Jacobs Project Management ($2.36M), WM Corporate Services ($1.21M). The register lists payee, date and amount only; no project or fund.
Look intoWhat projects the Wharton-Smith and Jacobs payments are for and whether they are within contract.
Conflict check County vendors (payments already made). No relationship found
Score worksheet: 25 + 25 + 15 + 25 = 90
| Rule | Part | Points | Evidence in the packet |
|---|
| T1 | Transparency | -10 | Registers list payee, date and amount; no project or fund for any payment |
DocumentsPrimary records
Retrieved October 3, 2026, about 5 PM ET. CON01: SHA-256 438d3ce34d346d88…, Clerk file modified Tue, 29 Sep 2026 19:18:08 GMT
93 of 100 · Verifiable. You can check what the Board is approving using only what the County posted. What cost points: Legal description (Schedule A) is a scan (-2); AT&T's requested maintenance reservation: inclusion not shown (-5). How to read the score
Clock
- Oct. 6, 2026Hearing is set
- Nov. 3, 2026Public hearing on the vacation, 9 AM
Money None to the County; no consideration for the land
WhoPetitioner Keto Burns, Southern Realty, the only affected owner. Engineer Westly Woodward.
WhatNotice a Nov. 3, 9 AM hearing to vacate unopened right-of-way at 201 Owens Ave, Butler Beach, creating one contiguous parcel. FPL, AT&T and Comcast cleared with conditions.
WhereSW and NW corners of A1A and Owens Ave; partly in Flood Zone AE.
WhenHearing Nov. 3, election day.
WhyRight-of-way "not used for traffic circulation"; staff has no objection.
Record checkSchedule A, the legal description, is a scanned exhibit. The memo and staff report state no area or value for the land. AT&T asked that maintenance rights be preserved; whether that condition is in the resolution is not shown.
Look intoArea and taxable value of the land; what the owner intends to build; whether the AT&T condition is written in.
Conflict check White Palmetto LLC. No relationship found
Score worksheet: 23 + 25 + 20 + 25 = 93
| Rule | Part | Points | Evidence in the packet |
|---|
| C4 | Completeness | -2 | Legal description (Schedule A) is a scan |
| T6 | Transparency | -5 | AT&T's requested maintenance reservation: inclusion not shown |
DocumentsPrimary records
Retrieved October 3, 2026, about 5 PM ET. CON02: SHA-256 794aac9ec63c1d30…, Clerk file modified Tue, 29 Sep 2026 19:18:08 GMT
98 of 100 · Verifiable. You can check what the Board is approving using only what the County posted. What cost points: Agreement is a scan (pp. 4-9) (-2). How to read the score
Corrected Oct. 3, 2026 The first edition said the residence agreement was missing. It is attached as scanned pages 4-9.
Money No rent; County provides water and sewer and up to $50 a month toward electric (agreement, p. 5)
WhoParks & Recreation; Sheriff's Office; an unnamed deputy. Corey Bowens, Land Management.
WhatApprove a one-year, annually renewable agreement letting a sheriff's deputy live in a privately owned mobile home at Riverdale Park to deter vandalism and trespass.
WhereRiverdale Park, CR 13 South.
WhenOne year from the first of the month after signing; renews annually at the County's option; either side may end it on 60 days' notice (p. 5).
WhyThe County "over the years" has let employees place mobile homes on County land to deter vandalism.
Record checkThe agreement is attached as scanned pages 4-9, with duties in Exhibit A (p. 9). The County carries no insurance for the resident or the mobile-home owner (p. 6). The recitals require the resident to be employed by and in good standing with the County; a deputy is employed by the Sheriff.
Look intoWhether the employment clause should name the Sheriff's Office; how many other parks have resident deputies.
Conflict check Resident deputy (private individual, not named); mobile-home owner Elleness, LLP. No relationship found
Score worksheet: 23 + 25 + 25 + 25 = 98
| Rule | Part | Points | Evidence in the packet |
|---|
| C4 | Completeness | -2 | Agreement is a scan (pp. 4-9) |
DocumentsPrimary records
Official web pages and portals
Retrieved October 3, 2026, about 5 PM ET. CON03: SHA-256 5860341693a50d7e…, Clerk file modified Tue, 29 Sep 2026 19:18:08 GMT
98 of 100 · Verifiable. You can check what the Board is approving using only what the County posted. What cost points: Schedule of values is handwritten (p. 5) (-2). How to read the score
Corrected Oct. 3, 2026 The first edition said a handwritten schedule read $17,322 or $23,052 and did not reconcile. It reads $4,621.95 and matches the lien release (p. 5).
Clock
- Oct. 6, 2026Acceptance; one-year warranty starts
- Oct. 6, 2027Warranty ends
Money $4,621.95
WhoDream Finders Homes; contractor Front Site Development.
WhatAccept valves and services serving the amenity center; one-year warranty.
WhereBrook Forest Drive, Silverleaf.
WhenDocuments signed Feb. 2026; Utility approval Aug. 12.
WhyUtility Department reviewed and approved.
Record checkThe handwritten schedule of values (p. 5) lists two gate valves ($1,022.00), two ball valves ($876.00) and two services ($2,723.95), totaling $4,621.95, which matches the lien release. No engineer's certification.
Look intoWhether other lienors exist; why no engineer's certification is included.
Conflict check Front Site Development. No relationship found
Score worksheet: 23 + 25 + 25 + 25 = 98
| Rule | Part | Points | Evidence in the packet |
|---|
| C4 | Completeness | -2 | Schedule of values is handwritten (p. 5) |
DocumentsPrimary records
Retrieved October 3, 2026, about 5 PM ET. CON04: SHA-256 0e3c1a11ea3daf34…, Clerk file modified Tue, 29 Sep 2026 19:18:09 GMT
98 of 100 · Verifiable. You can check what the Board is approving using only what the County posted. What cost points: Lien release notarized before it was signed (p. 7) (-2). How to read the score
Clock
- Oct. 6, 2026Acceptance; one-year warranty starts
- Oct. 6, 2027Warranty ends
Money $24,972 (water $8,072; sewer $16,900)
WhoConcert Marsh Landing, LLC; contractor First Coast Electric; "developer" listed as CSLD, LLC.
WhatAccept water and force-main lines serving restrooms off Marsh Landing Parkway.
WhereMarsh Landing Parkway area.
WhenSigned April 2026; approved Aug. 17.
WhyUtility Department reviewed and approved.
Record checkWater and sewer total $24,972, matching the lien release. The contractor's release of lien is signed April 23 and notarized April 20 (p. 7).
Errors in the County's packet- Lien release notarized April 20, signed April 23 (p. 7)
Look intoWhether the facility is public or private; CSLD's role; correcting the date before recording.
Conflict check Concert Marsh Landing, LLC; First Coast Electric, LLC. No relationship found
Score worksheet: 25 + 23 + 25 + 25 = 98
| Rule | Part | Points | Evidence in the packet |
|---|
| K3 | Consistency | -2 | Lien release notarized before it was signed (p. 7) |
DocumentsPrimary records
Retrieved October 3, 2026, about 5 PM ET. CON05: SHA-256 5074b4b8f112e783…, Clerk file modified Tue, 29 Sep 2026 19:18:09 GMT
98 of 100 · Verifiable. You can check what the Board is approving using only what the County posted. What cost points: Gravity-main line $69,150 vs. 4,277 x $16.17 = $69,159.09 (-2). How to read the score
Clock
- Oct. 6, 2026Acceptance; one-year warranty starts
- Oct. 6, 2027Warranty ends
Money $1,545,467.95 (water $537,371.60; sewer $1,008,096.35, of which $417,527.80 is the lift station)
Reconciliation| Figure | Source | Includes | Excludes | Ties? |
|---|
| $1,545,467.95 | CON06 pp. 10-12 | Water $537,371.60 + sewer $1,008,096.35 | Connection fees | Yes, with one line off by $9.09 |
WhoKB Home Jacksonville; contractor Pipeline Constructors.
WhatAccept a permanent utility easement over private roads and the water/sewer systems for about 155 lots; County assumes maintenance including a lift station.
WhereMaplewood plat, Map Book 131, pp. 45–50.
WhenDocuments April–July 2026; approved Aug. 13.
WhyUtility Department reviewed and approved.
Record checkWater and sewer schedules sum to the lien release (pp. 10-12). The lift station is our sum of five lump-sum lines on the sewer schedule (p. 11). One gravity-main line reads $69,150, the same as the hydrant line, and does not equal 4,277 x $16.17 ($69,159.09) (pp. 11, 14).
Errors in the County's packet- Gravity-main line $69,150 does not equal 4,277 x $16.17 (pp. 11, 14)
Look intoWhether Maplewood is gated; the $69,150 line; connection fees paid.
Conflict check KB Home; Pipeline Constructors. No relationship found
Score worksheet: 25 + 23 + 25 + 25 = 98
| Rule | Part | Points | Evidence in the packet |
|---|
| K3 | Consistency | -2 | Gravity-main line $69,150 vs. 4,277 x $16.17 = $69,159.09 |
DocumentsPrimary records
Retrieved October 3, 2026, about 5 PM ET. CON06: SHA-256 58ee9355dd32c0a3…, Clerk file modified Tue, 29 Sep 2026 19:18:09 GMT
100 of 100 · Verifiable. You can check what the Board is approving using only what the County posted. Nothing cost points. How to read the score
Corrected Oct. 3, 2026 The first edition said the lien release 'through' date was handwritten as March 17, 2025. It is typed as 3/17/2026 (p. 14).
Clock
- Oct. 6, 2026Acceptance; one-year warranty starts
- Oct. 6, 2027Warranty ends
Money $183,262.15 (water $144,851; sewer $38,411)
Reconciliation| Figure | Source | Includes | Excludes | Ties? |
|---|
| $183,262.15 | CON07 pp. 12-14 | Water $144,851 + sewer $38,411.15 | | Yes |
WhoRiver Rock Church, Inc.; contractor Vallencourt Construction.
WhatAccept a 0.49-acre easement and lines off Palm Valley Parkway.
WhereParcel 0232800012, Section 2, T5S R28E.
WhenSigned June 23, 2026; lien release covers work through March 17, 2026 (p. 14).
WhyUtility Department reviewed and approved.
Record checkWater ($144,851.00) and sewer ($38,411.15) sum to the lien release, $183,262.15. The 8-inch gate valve is priced at $13,297.76 each (p. 12), against $3,024.10 at Maplewood in item C6.
Look intoThe valve price variance; whether the line is sized for future connections.
Conflict check River Rock Church, LLC; Vallencourt Construction Company. No relationship found
Score worksheet: 25 + 25 + 25 + 25 = 100
| Rule | Part | Points | Evidence in the packet |
|---|
| No deductions: every part starts at 25. |
DocumentsPrimary records
Retrieved October 3, 2026, about 5 PM ET. CON07: SHA-256 515f53196addfa5b…, Clerk file modified Tue, 29 Sep 2026 19:18:10 GMT
98 of 100 · Verifiable. You can check what the Board is approving using only what the County posted. What cost points: All five exhibits are scans (-2). How to read the score
Corrected Oct. 3, 2026 The first edition said every exhibit was absent. All five are attached as scanned pages; the systems are valued at $1,608,736.40.
Money $1,608,736.40 (water $568,668.00; sewer $1,040,068.40 including a $384,000 lift station)
Reconciliation| Figure | Source | Includes | Excludes | Ties? |
|---|
| $1,608,736.40 | CON08 pp. 26-28 | Water $568,668.00 + sewer $1,040,068.40 | Connection fees | Yes: matches lien release |
WhoMHC Coquina Crossing LLC (owner of the manufactured-home community); contractor Grovin Farms LLC.
WhatAccept a utility easement, the water and sewer systems including a lift station, the lien release and the warranty.
WhereCoquina Crossing Phase IV.
WhenLien release June 10, 2026; Utility memo approved July 21.
WhyResolution recites Utility Department approval.
Record checkAll five exhibits are attached as scanned pages: easement and legal description (pp. 4-24), bill of sale and schedules of values (pp. 25-27), lien release for $1,608,736.40 (p. 28), warranty (p. 31) and the Utility Department memo (p. 32). Water and sewer schedules sum to the lien release. The lift station appears as a single $384,000 "other improvements" line with its equipment lines blank (p. 27); in item C6 the lift station is itemized.
Look intoWhy the lift station is not itemized; whether the community's roads are private.
Conflict check MHC Coquina Crossing LLC; Grovin Farms LLC. No relationship found
Score worksheet: 23 + 25 + 25 + 25 = 98
| Rule | Part | Points | Evidence in the packet |
|---|
| C4 | Completeness | -2 | All five exhibits are scans |
DocumentsPrimary records
Retrieved October 3, 2026, about 5 PM ET. CON08: SHA-256 a06ab3c11c8650d2…, Clerk file modified Tue, 29 Sep 2026 19:18:10 GMT
100 of 100 · Verifiable. You can check what the Board is approving using only what the County posted. Nothing cost points. How to read the score
Clock
- Oct. 6, 2026Acceptance; one-year warranty starts
- Oct. 6, 2027Warranty ends
Money $5,997.43
WhoFerguson Enterprises, LLC; contractor Allsite Contracting.
WhatAccept an 82.5-square-foot easement and a short main extension at 265 Commercial Drive.
Where265 Commercial Drive, St. Augustine.
WhenSurvey Jan. 2026; approved Aug. 12.
WhyUtility Department reviewed and approved.
Record checkLine items sum to the lien release. The warranty is dated eight months before acceptance but runs one year from acceptance.
Look intoNothing material.
Conflict check Ferguson Enterprises, LLC; Allsite Contracting. No relationship found
Score worksheet: 25 + 25 + 25 + 25 = 100
| Rule | Part | Points | Evidence in the packet |
|---|
| No deductions: every part starts at 25. |
DocumentsPrimary records
Retrieved October 3, 2026, about 5 PM ET. CON09: SHA-256 6422e80b8d8d39e1…, Clerk file modified Tue, 29 Sep 2026 19:18:10 GMT
98 of 100 · Verifiable. You can check what the Board is approving using only what the County posted. What cost points: Lease is a scan (pp. 4-22) (-2). How to read the score
Corrected Oct. 3, 2026 The first edition said the lease and rent were unreadable. The scanned lease sets rent at $1 plus a $300 annual fee (p. 5).
Clock
- Oct. 6, 2026Approval
- Oct. 6, 2031Five-year term ends if it starts at approval (start date not stated)
Money $1 rent for the term, plus a $300 annual administration fee (lease, p. 5)
WhoNEFCAA, a nonprofit; Corey Bowens.
WhatA five-year lease of office space with five one-year options; revocable by the County on 90 days' notice.
WhereSolomon Calhoun Community Center, off Duval Street.
WhenFive years plus up to five one-year extensions (p. 5). Memo says the agency is "continuing to lease," but no prior lease is cited.
WhyThe agency serves "vulnerable households."
Record checkThe lease is attached as scanned pages 4-22. Rent is $1 for the initial term and $1 for any extension, plus a $300 yearly administration fee; the County may adjust rent on notice (Section 2.3). Tenant may extend up to five one-year terms.
Look intoThe utility terms (Section 3); the prior lease; comparable terms for other nonprofit tenants.
Conflict check Northeast Florida Community Action Agency, Inc. No relationship found
Score worksheet: 23 + 25 + 25 + 25 = 98
| Rule | Part | Points | Evidence in the packet |
|---|
| C4 | Completeness | -2 | Lease is a scan (pp. 4-22) |
DocumentsPrimary records
Official web pages and portals
Retrieved October 3, 2026, about 5 PM ET. CON10: SHA-256 a138f801a3628c20…, Clerk file modified Tue, 29 Sep 2026 19:18:11 GMT
98 of 100 · Verifiable. You can check what the Board is approving using only what the County posted. What cost points: Notice is a scan (pp. 4-10) (-2). How to read the score
Corrected Oct. 3, 2026 The first edition said the executed notice was not readable. It is a scanned page (p. 7).
Clock
No term; runs with the land.
Money None stated
WhoRiver Plantation PRD Owners Association.
WhatMake the County beneficiary of a 10-foot easement between Lots 17 and 18 for access to a pump house and lake "in connection with fire protection."
WhereRiver Plantation, near Quiet Trail and Picolata Forest Drive.
Why"Health, safety, and welfare."
Record checkThe notice is attached as scanned pages 4-10, signed for River Plantation PRD Owners Association, with an insurance exhibit (p. 10). The County's signature block is blank pending approval.
Look intoWhether the lake is a dry-hydrant water source Fire Rescue will maintain; whether Lot 17/18 owners consented.
Conflict check River Plantation PRD Owners Association. No relationship found
Score worksheet: 23 + 25 + 25 + 25 = 98
| Rule | Part | Points | Evidence in the packet |
|---|
| C4 | Completeness | -2 | Notice is a scan (pp. 4-10) |
DocumentsPrimary records
Retrieved October 3, 2026, about 5 PM ET. CON11: SHA-256 85494297398a2662…, Clerk file modified Tue, 29 Sep 2026 19:18:11 GMT
93 of 100 · Verifiable. You can check what the Board is approving using only what the County posted. What cost points: Easement and signature page are scans (-2); Repair scope, contractor and cost behind the easement not shown (-5). How to read the score
Corrected Oct. 3, 2026 The first edition said the grantor's signature page was not visible. It is scanned page 6.
Clock
- Oct. 6, 2026Acceptance
- Jan. 4, 2027Easement expires, 90 days from execution if signed at approval
Money $10 consideration; repair cost not stated
WhoGrantor WCC DRI Owner, LLC c/o Stiles Corporation.
WhatAccept a 5,612 sq ft staging easement for lift-station repairs; expires at completion or 90 days.
WhereWorld Commerce Parkway, near IGP and I-95.
WhenDated "October ___, 2026."
WhyThe parcel "surrounds the lift station."
Record checkArea math checks. The County indemnifies the private owner and bears all restoration cost, with no cap stated; the repair scope, contractor and cost are not in the packet. The grantor's signature page is scanned page 6.
Look intoWhich lift station failed, the repair contract and cost; whether 90 days is realistic.
Conflict check WCC DRI Owner, LLC. No relationship found
Score worksheet: 23 + 25 + 20 + 25 = 93
| Rule | Part | Points | Evidence in the packet |
|---|
| C4 | Completeness | -2 | Easement and signature page are scans |
| T6 | Transparency | -5 | Repair scope, contractor and cost behind the easement not shown |
DocumentsPrimary records
Retrieved October 3, 2026, about 5 PM ET. CON12: SHA-256 c12bb5ec0fcc4ec9…, Clerk file modified Tue, 29 Sep 2026 19:18:11 GMT
98 of 100 · Verifiable. You can check what the Board is approving using only what the County posted. What cost points: Bid tabulation is a scan (p. 38) (-2). How to read the score
Corrected Oct. 3, 2026 The first edition did not open this 46.5 MB packet. It is now read in full (1,106 pages), including the five-bid tabulation on scanned p. 38.
Money $6,976,400 (base $5,296,700; odor-control alternate $1,649,700; utility allowances $30,000)
Reconciliation| Figure | Source | Includes | Excludes | Ties? |
|---|
| $6,976,400 | CON13 pp. 1-2 | Base bid, two allowances, odor-control alternate | Engineering (C19), outfall (C15) | Yes |
WhoSGS Contracting Services, Inc., High Springs; Purchasing, Jaime Locklear; design engineer Mott MacDonald (specifications).
WhatAward the contract for a new reverse-osmosis treatment building, pumps, controls and generator, demolition of the old building and tank, and an odor-control system.
WhereNorth Beach Water Treatment Plant.
WhenSubstantial completion 420 days after notice to proceed; final completion 30 days later (p. 11).
WhyUtility Department capital project, funded from Utility Services unrestricted capital (account 4488-56302-6285).
Record checkFive bids (bid tabulation, scanned p. 38). The tabulation's totals leave out the $30,000 in allowances: SGS $6,946,400; Sawcross $7,511,000; L7 Construction $7,618,700; Petticoat-Schmitt $7,744,511; ACON $8,660,000. L7's base bid ($5,238,700) was lower than SGS's ($5,296,700); SGS is low once the odor-control alternate is added ($1,649,700 against L7's $2,380,000). No engineer's estimate is shown. The memo says exhibits are "available upon request"; the contract, IFB, specifications and SGS's bid forms are in the packet. Figures reconcile: $5,296,700 + $10,000 + $20,000 + $1,649,700 = $6,976,400 (pp. 1-2). Liquidated damages are $2,376 a day for substantial and $2,196 for final completion (p. 12). Addendum 3 removed the building-manufacturer and erector license requirement (p. 1105).
Look intoThe engineer's estimate; why odor control was bid as an alternate; how this, C15 and C19 fit the plant's total budget.
Conflict check SGS Contracting Services, Inc. No relationship found
Score worksheet: 23 + 25 + 25 + 25 = 98
| Rule | Part | Points | Evidence in the packet |
|---|
| C4 | Completeness | -2 | Bid tabulation is a scan (p. 38) |
DocumentsPrimary records
Official web pages and portals
Retrieved October 3, 2026, about 5 PM ET. CON13: SHA-256 a0591a474b5cd3f9…, Clerk file modified Tue, 29 Sep 2026 19:18:15 GMT
87 of 100 · Mostly verifiable. You can check most of it; one or two pieces are missing, unclear or don't match. What cost points: No estimate or prior contract value (-10); Single bid after a re-solicitation (-3). How to read the score
Corrected Oct. 3, 2026 The first edition said the fund number was printed two ways. 1113 is the fund and 1137 the cost center; that was our error.
Clock
- Oct. 6, 2026Award; three-year term runs from execution
- Oct. 6, 2029Initial term ends (approx.)
Money $455,377.40 a year; about $1.37M over the 3-year term, $2.7M if renewed
Reconciliation| Figure | Source | Includes | Excludes | Ties? |
|---|
| $455,377.40 | CON14 p. 1 | Annual price after negotiation from $486,146.38 | Renewal-term CPI adjustments | Single bid |
WhoM & M Commercial Cleaning Concepts Inc., Jacksonville. Parks & Recreation and Beach Services.
WhatAward a three-year contract with one three-year renewal; $40 per unscheduled pickup; CPI adjustments capped at 3% on renewal.
WhereCounty parks, beach accesses, boat ramps, trails.
WhenThree years from execution.
WhyThe original IFB 2875 was re-solicited "due to discrepancies in the Scope of Services and other material issues." One bid was received; Purchasing negotiated it from $486,146 to $455,377.
Record checkA re-bid that still drew a single bidder leaves no competitive spread. Purchasing negotiated the price from $486,146.38 to $455,377.40 (p. 1). No budget estimate or prior contract value is given, and the packet does not say what changed in scope.
Look intoHow many bids the original IFB drew and what the discrepancies were; the prior contract's annual cost; what scope was reduced.
Conflict check M & M Commercial Cleaning Concepts Inc. No relationship found
Score worksheet: 25 + 25 + 12 + 25 = 87
| Rule | Part | Points | Evidence in the packet |
|---|
| T1 | Transparency | -10 | No estimate or prior contract value |
| T5 | Transparency | -3 | Single bid after a re-solicitation |
DocumentsPrimary records
Official web pages and portals
Retrieved October 3, 2026, about 5 PM ET. CON14: SHA-256 aacc8f110374c8ba…, Clerk file modified Tue, 29 Sep 2026 19:18:12 GMT
94 of 100 · Verifiable. You can check what the Board is approving using only what the County posted. What cost points: Drawings, specifications, geotech and permits "available upon request" (-4); Bid tabulation is a scan (p. 39) (-2). How to read the score
Corrected Oct. 3, 2026 The first edition said the other two bids were not in the packet. The bid tabulation is scanned page 39.
Clock
- Oct. 6, 2026Award
- May 4, 2027Substantial completion, 210 days from an Oct. 6 start (approx.)
Money $1,179,000 ($1,169,000 lump sum + $10,000 allowance)
Reconciliation| Figure | Source | Includes | Excludes | Ties? |
|---|
| $1,179,000 | CON15 pp. 1, 39 | Lump sum $1,169,000 + $10,000 allowance | | Yes; low of three bids |
WhoDB Civil Construction, LLC, St. Augustine. Utility Services.
WhatBuild concentrate piping and a marine outfall at the North Beach plant; 210 days to substantial completion; liquidated damages $796.22/day.
Where415 Nineteenth Street, St. Augustine.
WhenFDEP and Army Corps permits issued Aug. 10–20, 2026, weeks before award.
WhyThree bids received; DB Civil was lowest responsive. Funded from the 2026 water-sewer bond.
Record checkThree bids (bid tabulation, p. 39): DB Civil Construction $1,179,000; T B Landmark Construction $1,549,818; Badger Drilling dba Badger Underground $2,163,572.33. No engineer's estimate; a bidder asked for one before bids (p. 238). Drawings, specifications, geotechnical report and permits are "available upon request." The packet does not explain why the outfall is needed now.
Look intoThe engineer's estimate; what the FDEP permit allows to be discharged and where; whether nearby residents were notified.
Conflict check DB Civil Construction, LLC. No relationship found
Score worksheet: 19 + 25 + 25 + 25 = 94
| Rule | Part | Points | Evidence in the packet |
|---|
| C3 | Completeness | -4 | Drawings, specifications, geotech and permits "available upon request" |
| C4 | Completeness | -2 | Bid tabulation is a scan (p. 39) |
DocumentsPrimary records
Official web pages and portals
Retrieved October 3, 2026, about 5 PM ET. CON15: SHA-256 24e45b11c6b7c282…, Clerk file modified Tue, 29 Sep 2026 19:18:14 GMT
95 of 100 · Verifiable. You can check what the Board is approving using only what the County posted. What cost points: Single proposal (-3); Two payment deadlines in the contract (-2). How to read the score
Clock
- Oct. 6, 2026Award; five-year term from effective date
- Oct. 6, 2031Term ends (approx.)
Money County receives 70% of gross ad revenue; no minimum guarantee; rate card $12,000 per bus per year
WhoHybrid Design, Inc., St. Augustine. Transportation Planning (Sunshine Bus).
WhatFive-year exclusive advertising contract on about 15 fixed-route and 26 paratransit buses.
WhenFive years; no automatic renewal.
WhyOne proposal received and found responsive; "revenue-generating."
Record checkSingle proposal, no scoring sheet, no minimum guarantee, and the contract gives two different monthly payment deadlines (the 10th vs. 15 days after month-end). Prior contract and prior revenue are not stated. Ad approval is shared with the Council on Aging.
Errors in the County's packet- Two payment deadlines: the 10th of the month (pp. 9, 82) and 15 days after month-end (p. 26)
Look intoWhat the prior contract earned; why only one firm responded; how "political" ads will be defined.
Conflict check Hybrid Design, Inc. No relationship found
Score worksheet: 25 + 23 + 22 + 25 = 95
| Rule | Part | Points | Evidence in the packet |
|---|
| T5 | Transparency | -3 | Single proposal |
| K3 | Consistency | -2 | Two payment deadlines in the contract |
DocumentsPrimary records
Retrieved October 3, 2026, about 5 PM ET. CON16: SHA-256 a2187778c8f53376…, Clerk file modified Tue, 29 Sep 2026 19:18:15 GMT
91 of 100 · Verifiable. You can check what the Board is approving using only what the County posted. What cost points: Resolution reads "$3,500,00" (-2); Building area stated three ways (-2); Approved project budget and reason for the missed carryforward not stated (-5). How to read the score
Corrected Oct. 3, 2026 The first edition said the GMP cost summary was not visible. It is on p. 44.
Clock
- Oct. 6, 2026GMP approval
- Oct. 31, 2026Last day to elect value-engineering deducts (about $225K)
- Nov. 17, 2027Substantial completion
- Jan. 26, 2028Owner occupancy
Money $9,013,634; combined GMP $13,552,682; $3,500,000 fund-balance appropriation
Reconciliation| Figure | Source | Includes | Excludes | Ties? |
|---|
| $9,013,634 | CON17 pp. 1, 44 | Full construction GMP (base bid) | Design fees, impact and tap fees, alternates | Yes: cost summary totals to it |
| $13,552,682 | CON17 p. 4 | Amendment 1 ($4,539,048) + Amendment 2 | Amendment 1's $322,649 alternate | Yes, on the base figure |
| $3,500,000 | CON17 pp. 1-2 | Impact-fee fund balance appropriated | | Typo in resolution ($3,500,00) |
WhoAjax Building Company, construction manager at risk under RFQ 2114. Purchasing, Jaime Locklear.
WhatSet the GMP for full construction of a 36,000 sq ft one-story building at 901 Law Enforcement Way; recognize $3.5M of Law Enforcement Impact Fee fund balance.
WhereSJSO campus, St. Augustine.
WhenOriginal CM agreement June 20, 2025; Amendment 1 ($4,539,048) July 21, 2026; substantial completion Nov. 17, 2027. Value-engineering deducts of about $225,000 may be elected through Oct. 31.
WhyStaff recommends approval; the GMP fits "within the County's established budgetary limitations," a figure the memo does not give.
HistoryIn April 2024 the Sheriff's Office proposed moving staff out of a flood-prone headquarters into a new administration building beside its training center near SR 16 and I-95, then estimated at about $18 million, to be funded largely by County borrowing with law-enforcement impact fees covering debt service. Ajax Building Company was selected as construction manager at risk under RFQ 2114; the agreement was executed June 20, 2025 and funded through Series 2024A bonds. On July 21, 2026 the Board approved Amendment 1, the early-release package, at $4,539,048 base or $4,861,697 with a parking and drainage alternate. Today's amendment sets the remaining construction at $9,013,634 for a 36,000 sq ft tilt-up building at 901 Law Enforcement Way.
Record checkThe GMP cost summary is on p. 44: electrical $1,635,057, finishes $1,626,034, HVAC $1,346,139, general requirements $1,028,398, soft costs $969,563, for $9,013,634. Building size is given three ways: 38,000 sq ft (p. 44), 35,985 (p. 42) and 35,895 (p. 83). The July 21 agenda listed Amendment 1 at $4,861,697 (base plus a $322,649 alternate), while this packet carries it at the $4,539,048 base. The packet does not state the approved project budget or why FY26 funds were "not carried forward." The resolution contains a typo, "$3,500,00" (p. 2).
Errors in the County's packet- Resolution reads "$3,500,00" (p. 2)
- Building area stated as 38,000, 35,985 and 35,895 sq ft
Look intoThe total approved project budget; whether the Amendment 1 alternate was taken; which square footage is correct.
Conflict check Ajax Building Company, LLC. No relationship found
Score worksheet: 25 + 21 + 20 + 25 = 91
| Rule | Part | Points | Evidence in the packet |
|---|
| K3 | Consistency | -2 | Resolution reads "$3,500,00" |
| K3 | Consistency | -2 | Building area stated three ways |
| T6 | Transparency | -5 | Approved project budget and reason for the missed carryforward not stated |
DocumentsPrimary records
Official web pages and portals
Press
Retrieved October 3, 2026, about 5 PM ET. CON17: SHA-256 e2585a80431c6f2d…, Clerk file modified Tue, 29 Sep 2026 19:18:16 GMT
91 of 100 · Verifiable. You can check what the Board is approving using only what the County posted. What cost points: Exhibits "available upon request" (p. 1) (-4); No total program estimate for the multi-GMP job (-5). How to read the score
Clock
- Oct. 6, 2026Change order approval
- Oct. 26, 2026Assumed notice to proceed
- Jul. 20, 2027Final completion
Money $2,405,847.10; task order grows from $472,169 to $2,878,016 (+510%)
Reconciliation| Figure | Source | Includes | Excludes | Ties? |
|---|
| $2,405,847.10 | CON18 pp. 1-3 | GMP 1 early-work package | Later GMP packages | Yes: $472,169 to $2,878,016 |
WhoJacobs Project Management Co., design-builder under RFQ 1374R; subs Petticoat-Schmitt and Complete Services.
WhatGMP 1 early-work package: drill and test two production wells, abandon old Inlet Beach Well 2, site work and berm earthwork.
Where2650 Water Plant Road and 605 Palmera Drive East.
WhenNotice to proceed assumed Oct. 26; final completion July 20, 2027.
WhyBoard approval is required because the task order now exceeds $500,000 and was never before the Board.
Record checkArithmetic verified to the cent. This is GMP 1 of a multi-GMP job and no total program estimate is given. The memo says exhibits are available on request; the driller's pricing workbook is included (pp. 23-26).
Look intoThe full program cost through GMP 2; how the sub prices were obtained; why Well 2 is being abandoned.
Conflict check Jacobs Project Management Co. No relationship found
Score worksheet: 21 + 25 + 20 + 25 = 91
| Rule | Part | Points | Evidence in the packet |
|---|
| C3 | Completeness | -4 | Exhibits "available upon request" (p. 1) |
| T6 | Transparency | -5 | No total program estimate for the multi-GMP job |
DocumentsPrimary records
Official web pages and portals
Retrieved October 3, 2026, about 5 PM ET. CON18: SHA-256 3822ca434c469a77…, Clerk file modified Tue, 29 Sep 2026 19:18:16 GMT
93 of 100 · Verifiable. You can check what the Board is approving using only what the County posted. What cost points: Vendor name differs between memo and resolution (-2); What is being re-designed, and why, not stated (-5). How to read the score
Corrected Oct. 3, 2026 The first edition could not make the task lines add to $295,000. They do, once the $9,260 travel line is included (p. 7).
Clock
- Oct. 6, 2026Change order approval
- Dec. 6, 2027Task order final completion
Money Up to $300,000; task order grows from $399,895 to $718,815 (+80%)
Reconciliation| Figure | Source | Includes | Excludes | Ties? |
|---|
| $300,000 | CON19 p. 7 | Labor $285,740 + travel $9,260 + mileage $5,000 | | Yes |
WhoMott MacDonald Florida, LLC under continuing contract 22-01. Utilities, Scott Trigg.
WhatAdd construction-administration services (1,902 hours at $85–$285/hr) and extend the task order 556 days to Dec. 6, 2027.
WhenOriginal NTP July 3, 2025; Change Order 1 Jan. 29, 2026.
WhyServices needed "through the end of the completion of construction."
Record checkThe task lines (7.0 to 7.7) sum to $285,740; with $9,260 in travel they reach the $295,000 labor-and-expense total, and $5,000 in mileage brings it to $300,000 (p. 7). The packet does not say what is being re-designed or why. Vendor name differs between memo and resolution.
Look intoWhat triggered a re-design; the relationship to C13; why CA was not in the original scope.
Conflict check Mott MacDonald Florida, LLC. No relationship found
Score worksheet: 25 + 23 + 20 + 25 = 93
| Rule | Part | Points | Evidence in the packet |
|---|
| K3 | Consistency | -2 | Vendor name differs between memo and resolution |
| T6 | Transparency | -5 | What is being re-designed, and why, not stated |
DocumentsPrimary records
Retrieved October 3, 2026, about 5 PM ET. CON19: SHA-256 c2c9c2c3a15e5efd…, Clerk file modified Tue, 29 Sep 2026 19:18:16 GMT
95 of 100 · Verifiable. You can check what the Board is approving using only what the County posted. What cost points: Total-loss F-150 (10,012 miles): incident and insurance recovery not stated (-5). How to read the score
ClockNo decision
- Oct. 6, 2026Declared surplus
Disposal follows under Purchasing Policy 17.1; no dates.
Money No values stated
WhoPurchasing; Fleet, Parks, Fire Rescue, Property Appraiser, Library.
WhatSurplus 17 items: five vehicles and twelve pieces of equipment.
Why"Non-functional, obsolete, or no longer serves a useful purpose."
Record checkA 2025 Ford F-150 with 10,012 miles is listed as an insurance total loss with no incident or recovery stated. Items in "good" or "new" condition (kayaks, a desk, toner) are surplused without reason. No book values or disposal method per item.
Look intoWhat happened to the 2025 truck and what insurance paid; where auction proceeds go.
Conflict check None (County surplus). No relationship found
Score worksheet: 25 + 25 + 20 + 25 = 95
| Rule | Part | Points | Evidence in the packet |
|---|
| T6 | Transparency | -5 | Total-loss F-150 (10,012 miles): incident and insurance recovery not stated |
DocumentsPrimary records
Official web pages and portals
Retrieved October 3, 2026, about 5 PM ET. CON20: SHA-256 9a5065b5b22791dc…, Clerk file modified Tue, 29 Sep 2026 19:18:16 GMT
62 of 100 · Gaps. Important pieces are missing or don't match; you would have to ask the County to fill them in. What cost points: The grant application being ratified is not in the packet (-15); Appraisal not attached (-4); Purchase contract not attached (-4); Appraised value stated without the appraisal (-10); Operating funding "not yet identified" (-5). How to read the score
ClockHistorical
- Jul. 10, 2026Grant application window closed
- Oct. 6, 2026Retroactive ratification
The application was submitted before the Board saw it; the vote ratifies after the fact. Award decision by the State: date not in packet.
Money $568,000 state request; $568,000 County match from LAMP reserve; appraised $1,136,000
Reconciliation| Figure | Source | Includes | Excludes | Ties? |
|---|
| $568,000 | CON21 pp. 1-2 | State grant request; equal County match | Operating costs | Appraisal ($1,136,000) not attached |
WhoFlorida Division of Historical Resources; Community and Destination Development, Tera Meeks.
WhatRatify a special-category grant application for half the cost of an 1874 house at 10690 CR 13 North, Picolata, conditioned on finding an operator "on a budget neutral basis."
WhenApplication window closed July 10; the Board ranked the property in March.
WhyStaff could not bring it to the Board before the deadline "due to time constraints."
HistoryPicolata, where CR 13 meets the St. Johns River, was a Spanish crossing guarded by a 1700 fort and, from 1836 to 1870, the stagecoach-to-steamboat transfer point for St. Augustine. The Armstrong-Arnold House at 10690 CR 13 North dates to about 1874 and has been in owner Cindy Glidden's family for more than a century; it is a County-listed cultural resource but not a county landmark or National Register property. Steve and Cindy Glidden applied to LAMP (application 2025-04, about 2.3 acres) for a public purchase so the house could become a Picolata history museum. The Cultural Resource Review Board endorsed it in late 2025, LAMP ranked it in the 2026 top five, and the Board approved negotiations 5-0 on March 3. Staff filed the $568,000 state application in July against a $1,136,000 appraisal.
Record checkTwo pages. The application, appraisal, owner and purchase contract are not attached; no operator is identified and "continued operating dollars have not yet been identified."
Look intoWho owns the property and whether a price is agreed; whether the County proceeds if the grant is denied; the operator plan.
Conflict check Property owners (private individuals, not named). No relationship found
Score worksheet: 2 + 25 + 10 + 25 = 62
| Rule | Part | Points | Evidence in the packet |
|---|
| C1 | Completeness | -15 | The grant application being ratified is not in the packet |
| C3 | Completeness | -4 | Appraisal not attached |
| C3 | Completeness | -4 | Purchase contract not attached |
| T1 | Transparency | -10 | Appraised value stated without the appraisal |
| T6 | Transparency | -5 | Operating funding "not yet identified" |
DocumentsPrimary records
Official web pages and portals
Press
Retrieved October 3, 2026, about 5 PM ET. CON21: SHA-256 0dbf68afc515999d…, Clerk file modified Tue, 29 Sep 2026 19:18:17 GMT
90 of 100 · Verifiable. You can check what the Board is approving using only what the County posted. What cost points: County cap of $949,309 (p. 5) does not appear as a line in Attachment II (-10). How to read the score
Corrected Oct. 3, 2026 The first edition could not place $954,688. It is the health department's local-revenue line in Attachment II (p. 17), not the County appropriation.
Clock
- Oct. 1, 2026Contract year began
- Oct. 6, 2026Approval (five days into the term)
- Sep. 30, 2027Contract year ends
Money County cash up to $949,309; State up to $4,250,817; total program $11.77M
Reconciliation| Figure | Source | Includes | Excludes | Ties? |
|---|
| $949,309 | CON22 p. 5 | County direct contribution cap | Fees and local revenue ($954,688 line, p. 17) | Not as a line in Attachment II |
WhoFlorida Department of Health in St. Johns County; County Administrator as contract manager.
WhatApprove the standard annual operating agreement, Oct. 1, 2026 to Sept. 30, 2027; County also provides the 23,000 sq ft building in kind.
Where200 San Sebastian View.
WhyRequired under Chapter 154.
Record checkThe agreement caps the County's direct contribution at $949,309 (p. 5). The $954,688 in Attachment II is the health department's local revenue and expenditure line (p. 17), a different category. The $949,309 figure does not appear as a line in Attachment II as we read it. Trust-fund balance $1.97M; contingency reserve $2.1M. No prior-year figure for comparison.
Look intoWhere the $949,309 appropriation sits in Attachment II; how it compares to FY26.
Conflict check Florida Department of Health. No relationship found
Score worksheet: 25 + 15 + 25 + 25 = 90
| Rule | Part | Points | Evidence in the packet |
|---|
| K1 | Consistency | -10 | County cap of $949,309 (p. 5) does not appear as a line in Attachment II |
DocumentsPrimary records
Official web pages and portals
Retrieved October 3, 2026, about 5 PM ET. CON22: SHA-256 8fd166af7a8f73c5…, Clerk file modified Tue, 29 Sep 2026 19:18:17 GMT
83 of 100 · Mostly verifiable. You can check most of it; one or two pieces are missing, unclear or don't match. What cost points: The grant agreement being approved is not attached (award letter only, p. 4) (-15); Memo lists cameras not in this award (-2). How to read the score
ClockHistorical
- Aug. 20, 2026Grant awarded
- Oct. 6, 2026Acceptance and budget amendment
Money $6,322.63, no match
WhoFlorida Department of Law Enforcement; Medical Examiner's Office, Kelly Boulos.
WhatAccept a grant for a pathology saw, blades and instruments.
WhenAwarded Aug. 20, 2026.
WhyEquipment replacement.
Record checkThe memo also says the office "will procure the mirrorless cameras and macro camera lens," which are not in this award, apparently boilerplate from a prior year. The grant agreement is referenced but not attached.
Errors in the County's packet- Memo lists cameras that are not part of this award
Look intoNothing material beyond the stray sentence.
Conflict check Florida Department of Law Enforcement. No relationship found
Score worksheet: 10 + 23 + 25 + 25 = 83
| Rule | Part | Points | Evidence in the packet |
|---|
| C1 | Completeness | -15 | The grant agreement being approved is not attached (award letter only, p. 4) |
| K3 | Consistency | -2 | Memo lists cameras not in this award |
DocumentsPrimary records
Official web pages and portals
Retrieved October 3, 2026, about 5 PM ET. CON23: SHA-256 ed62d61e559d8c1d…, Clerk file modified Tue, 29 Sep 2026 19:18:17 GMT
98 of 100 · Verifiable. You can check what the Board is approving using only what the County posted. What cost points: Minutes call a Sept. 9 town hall "scheduled" at a Sept. 15 meeting (-2). How to read the score
ClockHistorical
- Sep. 15, 2026Meetings the minutes record
- Sep. 28, 2026Reconsideration meeting held; both Heritage enclaves reversed 3-2
- Oct. 6, 2026Minutes approved
Historical record. The special meeting these minutes authorize was held Sept. 28 and reversed both Heritage certifications 3-2.
Money FY2027 budget $1,939,752,566; aggregate millage 6.7559, 2.14% above rolled-back
WhatApprove the record of two meetings. Regular: ENCERT 2026-01 North Palm Valley denied 3-2; ENCERT 2026-08 AFI approved 3-2 with conditions; ENCERT 2026-07 Sandy Creek withdrawn; LDCA 26-05 food-truck parks enacted 5-0; a special meeting to reconsider ENCERT 2026-05 and 2026-06 approved 4-1 with no date set; $65,000 to Nourish Kids Center. Special: final millage 4-1, final budget 4-1, $125,000 removed "from the General Fund Revenue for the Black History Museum" 3-2, and consensus to bring back Flock camera funding options.
HistoryThe Sept. 15 regular meeting denied ENCERT 2026-01 North Palm Valley (about 4,462 acres, 3-2), approved ENCERT 2026-08 AFI (310 acres, 3-2), enacted the food-truck-park ordinance 5-0, and voted 4-1 to schedule a special meeting to reconsider the two Heritage Development enclaves approved 3-2 on Aug. 19. That meeting was held Sept. 28: over the developer's objection that the Board lacked authority to reconsider, both certifications were reversed 3-2. The evening budget hearing adopted a $1.94 billion budget and 6.7559 aggregate mills (4-1) and moved $125,000 for the Black History Museum (3-2).
Record checkThe cover file CON24.pdf returns 404; the minutes are split into 24a and 24b. The museum motion's wording (removing "revenue") is ambiguous. The minutes record an Amendment 3 town hall "scheduled on September 9," a date already past when announced; verify. The $109,234,299 "Transfer to Officers" line likely covers all constitutional officers.
Errors in the County's packet- Clerk's cover file CON24.pdf returns 404
- Sept. 15 minutes call a Sept. 9 town hall "scheduled"
Look intoThe legal basis for reconsidering certified enclaves, now being contested by the developer; what the $125,000 motion actually did to the budget; the Flock program's cost and the Board's pending decision on it.
DisclosureThese minutes record the 5-0 enactment of the food-truck-park ordinance (LDCA 26-05). The Outpost @ Old Moultrie Rd, a food truck park owned by the Coalition's founder that sponsors this site, is directly affected by that ordinance. The Coalition takes no position on approving the minutes.
Conflict check None (minutes). Related: see disclosure
Score worksheet: 25 + 23 + 25 + 25 = 98
| Rule | Part | Points | Evidence in the packet |
|---|
| K3 | Consistency | -2 | Minutes call a Sept. 9 town hall "scheduled" at a Sept. 15 meeting |